How to Combine Concrete by Hand on the Site
Appropriate combination of concrete components is quite essential because it have an effect on the concrete feature in its pure condition and in solidified condition. A concrete is stated to be properly blended in case it meets the subsequent prerequisites.
- Concrete combination must be consistent in colour.
- Concrete must accomplish appropriate uniformity for which it’s intended and blueprinted.
- Entire concrete components full combination.
- Cement paste must protect every aggregate facade.
Mixing by hand is followed for petite tasks and wherever the amount of concrete utilized is less. The subsequent method is obeyed for mixing concrete manually.
Course of Action:
Measure A (Combining Medium): Proper and waterproof medium must be utilized for combining concrete. Make a medium of iron leaves or bricks or lean concrete, of a dimension in accordance with the need of the concrete volume to be combined. Generally, a platform constructed of iron sheet possessing three m2 in dimension with pavements or stripes are utilized.
Measure B (Cement and Sand Dry Mixing): Distribute over the calculated sand amount consistently on the combining medium. Dispense the cement over the sand and spread it evenly. Combine the cement and sand with the trowels or shovels, rotating the combination again and again till it’s even in shade.
Measure C (Coarse aggregate dry mixing with cement sand mixture): Distribute over the sand cement mix one time more consistently over the combining medium. Other than that, distribute the calculated amount of coarse aggregate. Make no attempt to put down at single spot; else the larger components [particles] will be disposed to turn out. Combine once more no less than 3 durations through scooping from the middle to the margin, and subsequently back to the middle and over again to the edge.
Measure D (Water Inclusion): Form a slump in the centre of the combined structure and dispense gradually into ½ to 3 quarters of the overall amount of water needed. When the substance is presented to the middle through spades [shovels], include the remaining of the water gradually, rotating the combination again and again till the shade and uniformity are consistent all over the structure. That is going to specify that every component is comprehensively blended. The water must be dispensed gradually into the combination. That is properly performed through a florist’s water container equipped with a rose head. Launching water out of a container all at one time is going to cause its exit and carrying cement along with it.
Remark
- Blending period makes no attempt to go beyond three minutes.
- Combining medium is washed in the last part of the task, in order that it’s accessible and operative tomorrow.
Verification for uniformity: An approximate assessment of concrete uniformity can be done through performing the subsequent plain and instant check.
Get a fistful of concrete and press it firmly in the fist. In case the concrete is blended appropriately, subsequent to liberating the fist pressure, it is going to keep its form. Moreover, the example facade is going to be damp with no water coming out of it.
Article Source: civilblog.org