How to set up the Bill of Quantity (BOQ) of any construction work

Subsequent steps are included when setting up BOQ of any construction work.

Heading of the company setting up BOQ is written at the top and subsequently project name, name and place of work are written.

After that workplace (place of work), work items, their quantities, the rates are mentioned.

Like below:
Heading of company
BILL OF QUANTITY
Project name: ABC Project
Name of work: Repair and maintenance of XYZ works.
Place: State, Country

S.N. Description Unit Quantity Rate for every unit (In Words) Whole Amount
1 Earthwork excavation of soft dry sand comprising disposal equal to 10 m lead and 1.5 m lift m3 414 Seventy two and twenty nine paisa only 29,928.06
2 Structure backfilling jobs 15 cm ways compactionlayer 2/3rd of amount m3 136.17 One hundred eighteen and seventy five paisa only 16,170.19
3 Selling works with supplying of materials m3 1.20 One thousand four hundred forty six and twelve paisa only 1735.34
4 Plain Cement Concrete 1:3:6 work with all complete materials m3 0.96 Ten thousand four hundred thirty eight and ninety five paisa 10021.39
5 Plain Cement Concrete 1:2:4 work with all complete materials m3 12 Eleven thousand nine hundred thirty five and sixty four paisa 143,227.68
6 Supplying of formwork along with staging, shuttering, etc and fixing, fitting, centering, etc all complete comprising dismantling in accordance with specification and drawing m3 121 Seven hundred fifteen and eighty two paisa 16614.22
7 Reinforcement steel work for cut-off wall with cutting, bending, binding, placing, supplying all complete Kg 594.33 Ninety one and seventy seven only 54,541.66

Watch the following video to learn the complete process.

Lecturer: Civil Engineer

How to set up the Bill of Quantity (BOQ) of any construction work