How to compute concrete volume for retaining wall
We’ve assumed a retaining wall section. There’re two parts. First part is base (denoted by A) and second part is stem (denoted by B).
Therefore, retaining wall volume = base slab volume + stem volume
A) Base slab
Base slab length = 4 m
Base slab breadth = 12 m
Base slab thickness = 300 mm = 0.300 m
Base slab volume = length x breadth x height = 4 x 12 x 0.300 = 14.4 m3
B) Stem is in trapezoid shape
Stem length = 12 m
Stem height = 4 m
Pinnacle thickness (a) = 0.300 m
Bottom thickness (b) = 0.600 m
Therefore, stem volume = [{(a + b)/2} x h] x l
Stem volume = [{(0.3 + 0.6)/2} x 4] x 12 = 21.6 m3
Overall volume of retaining wall = 14.4 + 21.6 = 36 m3
In another type of generally constructed retaining wall, there’re three parts, one is base slab A and second is slab B, and third one is counterfort C.
Retaining wall volume = Base slab volume + stem volume + counterfort volume
Retaining wall volume = A volume + B volume + C volume
Let’s measure volume of base slab A
Volume of A = length x breadth x height = 13 x 3 x 0.3 = 11.7 m3
Let’s measure volume of stem B
Part B is in trapezoid shape,
Therefore, volume of B = [{(a + b)/2} x h] x l = [{(0.3 + 0.4)/2} x 4] x 13 = 18.2 m3
Let’s measure volume of counterfort C
Part C is in trapezoid shape,
Therefore, volume of C = [{(a + b)/2} x h] x l = [{(0.6 + 3)/2} x 4] x 0.3 = 2.16 m3
There are two counterforts, therefore,
Volume of C = 2 x 2.16 m3 = 4.32 m3
Overall volume of retaining wall = 11.7 m3 + 18.2 m3 + 4.32 m3 = 34.22 m3
To get more details, go through the following video tutorial.
Lecturer: Civil Study
Also, Read
- Reinforced Cement Concrete Retaining Wall (Cantilever Type)
- How to Calculate Quantity of Stone for Retaining Wall
- Download sample cad drawing of Infinity Type Swimming Pool Retaining Wall with Catch Pool
- Construction Process of a Curved Concrete Wall